When the structure of cement stabilized soil layer construction


When the structure of cement stabilized soil layer construction , shall comply with the following provisions:
( 1 ) should be as clod crushing clods maximum size should not exceed 15mm.
( 2 ) the ingredients should be accurate .
Construction ( 3 ) should be paving way process cement mix evenly .
( 4 ) should be strictly  Wet mix plant  base thickness and elevation , its road humps cross slope should be consistent with the surface layer .
( 5 ) should be at or slightly larger than the optimum moisture content ( when the weather is hot and dry , concrete mixing plant , grass mixes can be as large 1% to 2% ) performed in the mix when rolling until the following by heavy compaction test method determine the degree of  concrete mixer plant  requirements ( minimum requirements ) .
( 6 ) watering , mixing evenly .
After the contents of the above description is stable construction requirements for soil mixing station , we saw the contents of the above , and has stabilized soil mixing station to have a lot of understanding of it , in fact, is already in our lives without it a .