2013年8月26日星期一

Green concrete construction needs

 Mixing station tooling equipment configuration (1) satisfy non-ballasted track railway passenger line concrete construction needs. (2) meet the company on the establishment of standardized technical conditions for concrete mixing station.
mixing station's main venue should be concrete hardening, hardening capacity venue to meet operational requirements. Concrete mixing plants according surrounded by low, the center of high principles, surface drainage slope of not less than 1.5%, the venue shall be installed around drains, gutters bottom using cement mortar plastering. Part of the appropriate regional office and living green.  shall sump, settling ponds and ready mix concrete plant ponds into the field area planning, factory designed, constructed and put into use. Forbidden to station wastewater directly discharged.