Laboratory scale to meet peak concrete and raw materials inspection and test requirements. Concrete mixing plants sector applications or color steel brick walls, metal fences, some closed material stacking area, mixing area, work area, mixing station road should be hardened. Where heavy traffic road hardening thickness not smaller than 20cm (numerals not less than C20), local areas should be arranged in small bars. The mixing station are set electronically controlled gates, gates column using brick, column mixing station stop sign hanging on. All measuring instruments must be calibrated and Technical Supervision. Station configuration control room air conditioners, computers, printers, telephones, screen monitoring system. Summer construction, precast concrete plant be water-cooling equipment. Coarse and fine aggregate required inspection area erection color solid color steel skeleton anti-canopy. Mixing station must be configured over 300kw standby generator.