concrete transportation Delivery Management

1, concrete mixer truck used transport, transportation scheduling and truck before mixing station operator must live view of transport routes, to ensure smooth transportation. 2, stationary concrete batching plant in transit to 4r/min speed agitation reached when pouring concrete mixer transport locations, should be high-speed rotation 20s ~ 30s, before pouring the concrete mixture unloading. Transported to the pouring of concrete place, the responsible attention, collecting concrete mixture into the mold slump and workability, and timely scheduling and duty to the Concrete batching plant testers feedback, to facilitate timely correction. 3, the first car arrived at the scene after the concrete work must be performed by the team (or work sites) technical director Verify Truck "concrete batching notice" data confirm technical indicators and pouring concrete and other parts used for unloading correct before pouring, or refund mixing station. 4, the entire process of pouring or filling operations team (or work sites) construction site person in charge at all times to maintain contact with the mixing station scheduling, easy speed control according to the site pouring concrete mixing transport speed, to ensure the smooth construction of concrete. 5, the concrete unloading is complete, the job queue (or work sites) commissioned a number of concrete sign and acknowledge the completion formalities, easy handling concrete use of clearing procedures.

没有评论:

发表评论