Precast concrete pouring elsewhere rather than at the end of the construction site. Different sizes, shapes precast reinforced concrete can be used after cracking its reliability and toughness. In recent years, precast concrete with its low cost, excellent performance and become the new darling of the construction industry.
2013年7月29日星期一
mix concrete production process
1, mixing station scheduling based on job queue (or work sites) presented "concrete delivery notice" to issue official ready mix concrete plant, while making material preparation and mechanical equipment maintenance and other preparatory work. 2, mixing station under "Concrete delivery notice" ready to work, ready to notify the laboratory work is completed impose control personnel to reach the scene, check to make sure the readiness of various materials, and then follow the exact precast concrete plant entry computer systems. 3, mixing station and ready to work, touch operations team (or work sites) is ready to complete the construction site, to be mixing, pumping, filling and other aspects of the work are ready to complete, before the concrete production. Also check the check measurement accuracy and detection quality of concrete mixture, and make construction records.
订阅:
博文评论 (Atom)
没有评论:
发表评论