Precast concrete pouring elsewhere rather than at the end of the construction site. Different sizes, shapes precast reinforced concrete can be used after cracking its reliability and toughness. In recent years, precast concrete with its low cost, excellent performance and become the new darling of the construction industry.
2013年7月30日星期二
mixing station civilized construction accountability
1, mixing station every day after work must arrange for cleaning of the site, the concrete residue eradicate station and Stationary conacrete plant, cleaning after reported webmaster acceptance. 2, prohibits non-mixing station operating room operating personnel from entering the interior kept clean and tidy. 3, mixing station control room personnel must be cut off after work, power and water supply, shut doors and windows, ready mix concrete plant to ensure the safety of indoors, but also can reduce dust floated into the room. 4, mixing station after specimen production station, clean the residual concrete. 5, aggregate warehouse cleaning must arrange 24 hours in order to maintain warehouse clean, timely aggregate subballast to clear, warehouses often sprinkling dust.
订阅:
博文评论 (Atom)
没有评论:
发表评论