According to national standard "GB / T 10171-2005 concrete mixing station (F)" defines the popular explanation mixing materials distribution process is top-down material from storage silos Stabilized Soil Mixing Plant weight into the mixer, mixing plant material delivery process takes mechanical lift into the mixer. But with the domestic market demand and manufacturers continue to develop, improve, market structure has been widely accepted distinction as: mixing of the production process for the measurement of material storage → → → mixing → unloading upgrade; mixing of material storage → Measurement → upgrade → transition bucket → mixing → unloading, mixing after adding transition bucket-line production process will evolve into the production process than double parallel concrete mixer machine to save a third of production time, thereby improving equipment productivity.
Mixing station specifications are in accordance with the theory of production per hour named, common specifications are: HZS25, HZS40, HZS50, HZS75; dual mixer mixing station specifications are: 2HZS40, 2HZS60 two kinds, mainly for Such as: the amount of small fluctuations in discharge pumping occasion, pumping material evenly to prevent pipe blockage, often supporting HBT40, HBT60 concrete pump; such as: continuous pouring of concrete pipe and other equipment with double safety factor to enhance the occasion.
没有评论:
发表评论